Ventilation works

- Rebuild overcast and install walkways
- Repair and respray 5psi stoppings
- Remove stowage roadway.
- Building of techseal stoppings
- Installation of air lock doors
- 3 x Longwall ventilation establishments for the start of longwall mining
Gas Drainage
- 18” Gas Pipe installation
- 24” gas pipe installation
- Installation of 4” and 6” pipe installation
- Methane drainage site reclaims
Conveyor Installations, extensions, maintenance, recovery
- Installation 302 belt (Fast gate Structure)
- Installation 302 install belt and Combi drive
- Installation of Cataract belt
- Installation of Cataract cross belt and jiffy drive
- Recovered 2700m of structure and railway line
Secondary support, and reclaiming of old roadways
- Recovered 80m of roof fall at 219 panel roadway for future Longwall roadway
- 9 metre high cavity fill to reclaim an old roadway
- Mega bolting
Installation of the Appin pit bottom crane
SSS was awarded the tender to install the 2 x 25t cranes for the loading and unloading of materials at the bottom of the man and materials drift.
Appin Brennon Panel
- Built 25 x 5 PSI rated Aquacrete stoppings
- Removed Rail way line
- Installed air over hydraulic doors
- Built Service lines, air water pump out
- Reclaimed old flooded workings
- Reclaimed 2 x falls
Appin 301/ 302/ and 702 currently- Development driveages
SSS completed the gate road driveage for 301, 302 and is currently doing 702-panel drive age, completing all associated development panel works such as:
- Panel advancements
- Gate end Box moves
- Stoppings
These driveages have been completed on time, without incident and to a high standard.
Appin Area 3 Cataract heading
- Built 25 x 5 PSI rated Aquacrete stoppings
- Removed Rail way line
- Installed air over hydraulic doors
- Built Service lines , air water pump out
- Reclaimed old flooded workings
- Reclaimed 2 x falls
|